Manufactured types
multilift
Multilift hook-lift
Open-top 7.6–40 m³ to DIN 30722. Construction debris, scrap, snow, MSW. Lead time 3 working days.
skip
Skip bin
Trapezoidal 5–15 m³ to DIN 30720. Compact for tight sites. Lead time 2 working days.
press
Press container
Compacts volume 4–5× to DIN 30722. 220/380V hydraulics, safety interlocks. Lead time up to 20 working days.
mesh
Mesh container
Galvanised corrugated wire mesh to DIN 30700. For separating recyclables on the sorting line.
Ready to choose?